TTESSOR
tessor.ai

AI Infrastructure, Tessellated

The Backbone of
Next-Gen AI Compute.

B300·GB300 NVL72·Air & Liquid Cooled
Vera Rubin ReadyDeploy 3-5x Faster
Tessor Modular Data Center - GPU Infrastructure Container

Design Philosophy

Compute-Centric

Every decision starts with the GPU workload. Engineered around the compute, not the other way around.

Mission-Critical, Tier III

Enterprise SLA standards and N+1 redundancy. Engineered to accelerate offtake contracting and project financing.

Standardized for Speed

Design once, deploy repeatedly. Identical units. Aligned with upstream GPU reference architectures.

GPU-Ready AI Compute Facilities

Tessor 60

Air + Liquid

Every Blackwell HGX. Your choice of cooling.

60 kW

per rack

10

racks / unit

540 kW

IT load

CoolingLiquid-cooled (DTC) or Air-cooled
GPU Support

Blackwell HGX-class (B200, B300)

Air or liquid

ArchitectureTier III reliability
Hopper ReadyH100 · H200 (HGX-class)

Flexible density. Two cooling paths. Ready for today's AI workload.

Tessor 150

Liquid

Every high-density Blackwell. On liquid, on roadmap to Rubin.

150 kW

per rack

20

racks / unit

2.5 MW

IT load

CoolingLiquid-cooled (DTC 85% + Air 15%)
GPU Support

Blackwell high-density liquid (132–150 kW/rack)

GB200 NVL72 · GB300 NVL72 · 8× HGX B300 liquid

ArchitectureTier III reliability
RoadmapVera Rubin · 800VDC · Higher density

Rack-scale frontier. Built once, built for what's next.

From Power to Compute

Industry Incumbent
Tessor
12-36 months from request to construction start
Weeksfrom contract to GPU-live
Hundreds of workers on-site for integration and commissioning
Factory-integrated, tested, shipped ready to operate
Bespoke engineering per project, design repeated from scratch
Standardized, repeatable, designed for the latest GPU architectures
MV switchgear lead time: 54 weeks median
Pre-sourced, factory-installed, zero site-side lead time
Source: McKinsey, "The $7 Trillion Data Center Build-Out," 2026. Prefabricated, factory-integrated builds cut timelines by 50-70%.

Why Buy Tessor

You HaveYou NeedTessor Delivers
GPUs, customers, capitalFastest path to GPU-live and revenueFactory-tested facilities, site-ready in weeks
10-50 MW powerA path from energy to AI compute revenueTurnkey AIDC on your site, designed for enterprise offtake
Land and power accessA partner to develop and deploy AIDCTessor helps make your site contractable and financeable
Build capabilityAn AIDC product for your clientsPartner with Tessor. We supply the product, you deliver.